Credit scorecard — Oakville 2026 bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
—Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums — not documented
0%
—Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
—Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
15%
Pre vs post peak discharge
No quantified pre-vs-post hydraulic events extracted.
Stormwater controls (2)
InfiltrationInfiltration Gallery (Drywell)
Required where existing topography necessitates a drywell to manage stormwater; geotechnical report required to support drywell design brief.
SwaleInterceptor Swale
Minimum depth 150mm, minimum slope 2%, maximum length 60m before outfall to sewer, creek or road/block. Interceptor swale on lower lot adjacent to rear lot line to divert drainage to side yard swales.
Best management practices (9)
Infiltration gallery (drywell)SwalesRoof leader downspout disconnectionSplash pads for erosion controlSump pump discharge to storm sewerErosion and sediment controlsFiltration-retention deviceRainwater reuseEvapotranspiration
Site characteristics & report metadata
Project typeUnknown
Water balance capture5.0 mm
Quality control methodinfiltration, evapotranspiration, and rainwater reuse for first-flush retention; filtration-retention device for added impervious runoff
Extraction audit
Confidence: low
Completeness: 33%
Source: 10-page PDF
Extractor: PARCELFLOW v1
Validation: review recommended
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.