772 Winston Churchill Boulevard - Fengate Industrial Development · New · 2022-12-19
Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
|---|---|---|---|
| 25Mm Extended Detention | 0.014 | 0.013 | −7% |
| 2-yr 4-hr Chicago | 0.076 | 0.043 | −43% |
| 5-yr 4-hr Chicago | 0.148 | 0.105 | −29% |
| 10-yr 4-hr Chicago | 0.203 | 0.138 | −32% |
| 25-yr 4-hr Chicago | 0.266 | 0.162 | −39% |
| 50-yr 4-hr Chicago | 0.348 | 0.18 | −48% |
| 100-yr 4-hr Chicago | 0.428 | 0.196 | −54% |
| 2-yr 24-hr Scs | 0.135 | 0.088 | −35% |
| 5-yr 24-hr Scs | 0.209 | 0.129 | −38% |
| 10-yr 24-hr Scs | 0.269 | 0.152 | −43% |
| 25-yr 24-hr Scs | 0.358 | 0.182 | −49% |
| 50-yr 24-hr Scs | 0.415 | 0.197 | −53% |
| 100-yr 24-hr Scs | 0.5 | 0.208 | −58% |
| Regional | — | 1.602 | — |
63mm orifice at elev 89.15 for extended detention; 260mm orifice at elev 91.80 for quantity control. Below ground storage chambers MC-4500.
Located at southeast corner of site. Emergency overflow weir 21.0m wide at elev 93.80 directing flow to Clearview Creek channel.
Surface ponding in loading dock area between Building A and Building B. Max ponding depth 0.08m during 100yr 24hr SCS storm. Secondary 5.0m emergency overflow weir.
Three JellyFish JF12-20-5 units in parallel providing 80% TSS removal. Located immediately upstream of storm outlet. ETV certified. Sized for 11.92 ha at 85% imperviousness.
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.