Parsed SWM report

772 Winston Churchill Boulevard

772 Winston Churchill Boulevard - Fengate Industrial Development · New · 2022-12-19

Consultant: a.m. candaras associates inc. Model: VisualOTTHYMO Revision: Rev 3
Credit scorecard — Oakville 2026 bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums
50%
Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
50%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
25Mm Extended Detention0.0140.013−7%
2-yr 4-hr Chicago0.0760.043−43%
5-yr 4-hr Chicago0.1480.105−29%
10-yr 4-hr Chicago0.2030.138−32%
25-yr 4-hr Chicago0.2660.162−39%
50-yr 4-hr Chicago0.3480.18−48%
100-yr 4-hr Chicago0.4280.196−54%
2-yr 24-hr Scs0.1350.088−35%
5-yr 24-hr Scs0.2090.129−38%
10-yr 24-hr Scs0.2690.152−43%
25-yr 24-hr Scs0.3580.182−49%
50-yr 24-hr Scs0.4150.197−53%
100-yr 24-hr Scs0.50.208−58%
Regional1.602
Stormwater controls (4)
Underground storageStormTech Chambers MC-4500
Storage volume1,837.0 m³
Outletorifice
Outlet invert89.15 m

63mm orifice at elev 89.15 for extended detention; 260mm orifice at elev 91.80 for quantity control. Below ground storage chambers MC-4500.

Dry detentionSurface Dry Pond
Storage volume3,405.0 m³
Outletoverflow
Outlet invert93.80 m
100-yr HGL93.39 m

Located at southeast corner of site. Emergency overflow weir 21.0m wide at elev 93.80 directing flow to Clearview Creek channel.

Underground storageSurface Ponding - Loading Dock Area
Storage volume820.0 m³
Outletoverflow
Outlet invert94.00 m
100-yr HGL93.58 m

Surface ponding in loading dock area between Building A and Building B. Max ponding depth 0.08m during 100yr 24hr SCS storm. Secondary 5.0m emergency overflow weir.

Oil-grit separatorJellyFish JF12-20-5 Units (x3 in parallel)
Outletother

Three JellyFish JF12-20-5 units in parallel providing 80% TSS removal. Located immediately upstream of storm outlet. ETV certified. Sized for 11.92 ha at 85% imperviousness.

Best management practices (12)
StormTech MC-4500 underground storage chambersSurface dry pondSurface ponding in loading dock areaJellyFish JF12-20-5 OGS unitsExtended detention (25mm storm over 48 hours)Controlled flow roof drainsEmergency overland spillwaySilt fencesTemporary sediment basinDiversion swalesInlet protection devicesSediment traps
Site characteristics & report metadata
Project772 Winston Churchill Boulevard - Fengate Industrial Development
Project typeNew
DeveloperFengate Asset Management
Existing land usevacant
Proposed land useindustrial warehouse
Site area15.59 ha
Water balance capture25.0 mm
TSS removal target80%
Allowable release rate14.0 L/s
Quality control methodThree parallel JellyFish JF12-20-5 oil-grit separator units providing 80% TSS removal, located offline immediately upstream of storm outlet
Extraction audit
Confidence: high Completeness: 92% Source: 153-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.