Parsed SWM report

7198-7214 Airport Road

7198-7214 Airport Road Redevelopment · Redevelopment · 2022-02-16

Consultant: Jain Infrastructure Consultants Ltd. Engineer: Yasar Ayub P.Eng sealed Model: UNKNOWN
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
discharge reduction — not documented
0%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water-balance capture (2%/mm) — not documented
0%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
40%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
2-yr40.4165.76+63%
5-yr54.3288.4+63%
10-yr66.91108.89+63%
25-yr76.84125.06+63%
50-yr85.78139.6+63%
100-yr94.92154.48+63%
Stormwater controls (5)
Underground storageParking Detention (A1, A2, A3)
Storage volume49.7 m³
Outletorifice
Outlet invert168.06 m
100-yr HGL169.40 m

Parking surface ponding detention with 250 mm maximum storage depth for 100-year rainfall event

Green roofRoof Storage - New Building (Phase 2)
Storage volume18.2 m³
Surface area0.071 ha
Outletpipe

708 m2 footprint, 95 mm maximum depth, allows 6 L/s release

Green roofRoof Storage - Existing Building (Phase 1)
Storage volume28.9 m³
Surface area0.097 ha
Outletpipe

967 m2 footprint, 91 mm maximum depth, allows 6 L/s release

Underground storageStorm Pipes/Catch Basins/Manhole Storage
Storage volume12.1 m³

Storage within storm pipes, catch basins, and manholes

Oil-grit separatorStormceptor EFO4 at STMH1
Outletpipe
Outlet invert168.05 m

Stormceptor Model EFO4, 80% TSS removal, upstream orifice control flow rate 50.40 L/s, drainage area 0.49 ha, oil/fuel spill risk site

Best management practices (7)
Stormceptor EFO4 oil-grit separatorRoof storage detentionParking surface detentionOrifice control (125 mm diameter)Silt fenceMud mat construction accessDrain inlet protection
Site characteristics & report metadata
Project7198-7214 Airport Road Redevelopment
Project typeRedevelopment
DeveloperArjun Kumar / 2182402 Ontario Inc.
Existing land usecommercial/residential mixed (retail building with asphalt parking and residential dwellings)
Proposed land usemixed residential (4-storey townhouse block with parking, residential addition above existing retail)
Site area0.52 ha
Impervious63% (pre) → 87% (post)
TSS removal target80%
Allowable release rate50.4 L/s
Quality control methodoil-grit separator (Stormceptor EFO4) at storm manhole STMH1
Extraction audit
Confidence: high Completeness: 96% Source: 36-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: Functional-Servicing-Stormwater-Management-Report-February-2022-OZOPA-22-27.pdf (36 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.