Parsed SWM report

65-71 Agnes Street

65-71 Agnes Street 29 Storey Condominium · Redevelopment · 2024-09-20

Consultant: MTE Consultants Engineer: Joseph Asztalos, P.Eng. P.Eng sealed Model: OTHER Revision: Revised: September 20, 2024
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
discharge reduction — not documented
0%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
2-yr0.023
100-yr 24-hr0.023
Stormwater controls (2)
Underground storageStorm Tank (P1 Parking Level)
Storage volume154.8 m³
Outletorifice
Outlet invert111.80 m
100-yr HGL114.53 m

Tank footprint 57.5 m2, active storage height 2.69 m, 75 mm (nominal) / 77 mm diameter orifice plate, Cd=0.63, invert at 111.80 m, C/L orifice at 111.84 m. Bottom of tank set 0.32 m below outlet to retain 18.0 m3 for greywater reuse.

Rainwater harvesting / reuseGreywater Reuse Cistern (within Storm Tank)
Storage volume18.0 m³
Treatment volume18.0 m³
Outletother

18.0 m3 retained for water retention requirement (5 mm over 3600 m2 site area). Water used within 72 hours of rainfall event for greywater and irrigation. Designed by mechanical engineer.

Best management practices (5)
Underground storm tank with orifice controlGreywater reuse cisternSilt control fencingCatchbasin inlet protection (filter fabric / silt sacks)Mud mat at site exit
Site characteristics & report metadata
Project65-71 Agnes Street 29 Storey Condominium
Project typeRedevelopment
DeveloperIntentional Capital
Existing land useresidential
Proposed land usehigh-rise residential condominium
Site area0.36 ha
Impervious14% (pre) → 83% (post)
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate23.0 L/s
Quality control methodNo water quality controls proposed — roof water considered clean and no surface parking runoff; quality control waived with City acceptance
Extraction audit
Confidence: high Completeness: 92% Source: 33-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: OPA-OZ-22-017-W7-Functional-Servicing-and-Stormwater-Management-Report-July-2024.pdf (33 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.