560 Winston Churchill Boulevard - Stormwater Management and Functional Servicing Report · Redevelopment · 2023-08-17
Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
|---|---|---|---|
| 2-yr | 0.057 | 0.037 | −35% |
| 5-yr | 0.111 | 0.074 | −33% |
| 10-yr | 0.152 | 0.106 | −30% |
| 25-yr | 0.199 | 0.144 | −28% |
| 100-yr | 0.321 | 0.233 | −27% |
| 100-yr 24-hr Scs | 0.321 | 0.272 | −15% |
| Regional | — | 1.832 | — |
Permanent pool volume 3,045.1 m3 between elevations 90.00m and 91.10m. Erosion control volume 3,146.2 m3 between 91.10m and 91.90m. 125mm orifice at invert 91.10m; 175mm weir at elevation 91.90m; emergency overflow weir at 93.00m (12.00m wide). Drawdown time for erosion control volume is 61.1 hours. Enhanced Protection Level (80% TSS removal) per MOE SWMP 2003.
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.