Parsed SWM report

491 Springbrook Avenue & 851 Garner Road East

Springbrook Meadows West Development – 491 Springbrook Avenue & 851 Garner Road East · Subdivision · 2020-09-11

Consultant: S. Llewellyn & Associates Limited Engineer: John Oreskovic, P. Eng. P.Eng sealed Model: OTHER
Credit scorecard — Hamilton bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

On-site controls
documented source control on the site
50%
Lake Ontario green-space bonus
direct discharge + green-space parcel flag (90% tier) — not documented
0%
Net credit
50% baseline; up to 90% with Lake Ontario direct-discharge + green-space flag
50%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
2-yr 24-hr0.2610.066−75%
5-yr 24-hr0.4490.178−60%
10-yr 24-hr0.5820.271−53%
25-yr 24-hr0.7730.412−47%
50-yr 24-hr0.9170.516−44%
100-yr 24-hr1.0640.615−42%
Stormwater controls (3)
Wet detention pondSWM Wet Pond
Storage volume7,651.0 m³
Treatment volume932.0 m³
Outletorifice
Outlet invert242.50 m
100-yr HGL243.78 m

Two-outlet system: Outlet No. 1 is 110mm diameter circular orifice at invert 242.50m for extended detention (erosion control); Outlet No. 2 is 675mm diameter orifice pipe at invert 242.95m for quantity control. Permanent pool volume = 1898 m3 (provided 1800 m3 per quality table). Extended detention volume provided = 932 m3. Clay liner (500mm thick) recommended. Bottom of pond at 240.80m. 29-hour drawdown time for extended detention.

Oil-grit separatorHydroStorm Oil/Grit Unit HW1 (West Inlet)
Outletother

HydroStorm HS-5 unit serving catchments 200 & 201 (0.996 ha, 78% imp). Provides 72% TSS removal. Used as forebay replacement.

Oil-grit separatorHydroStorm Oil/Grit Unit HW2 (East Inlet)
Outletother

HydroStorm HS-10 unit serving catchments 100 + 301 + 400A,B,C + 401A,B,C,D + 501 (4.211 ha, 71.5% imp). Provides 75% TSS removal. Used as forebay replacement.

Best management practices (6)
Wet pond SWM facilityOil/grit separator (HydroStorm HS-5)Oil/grit separator (HydroStorm HS-10)Clay linerLow Impact Development (LID) measures (enhanced swales, rain gardens, rooftop infiltration – to be confirmed at Site Plan stage)Sediment and erosion control
Site characteristics & report metadata
ProjectSpringbrook Meadows West Development – 491 Springbrook Avenue & 851 Garner Road East
Project typeSubdivision
DeveloperSpringbrook Meadows West Developments Inc. and 2299453 Ontario Inc.
Existing land usevacant
Proposed land usetownhouse residential
Site area6.68 ha
Impervious0% (pre) → 62% (post)
Water balance capture25.0 mm
TSS removal target80%
Quality control methodwet pond (enhanced 80% TSS removal) with oil/grit separator pre-treatment in lieu of forebays
Extraction audit
Confidence: high Completeness: 100% Source: 129-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.