Credit scorecard — Mississauga bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
—Peak Flow
discharge reduction — not documented
0%
✓Water Quality
BMP present, TSS % not stated
30%
—Runoff Volume
water-balance capture (2%/mm) — not documented
0%
✓Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
20%
Pre vs post peak discharge
No quantified pre-vs-post hydraulic events extracted.
Stormwater controls (2)
Underground storageStormwater Cistern (SWM Tank)
Storage volume338.0 m³
Outletorifice
Cistern footprint 150 m2, depth 2.25 m, volume approximately 338 m3. Located on P1 level below south building. Outlet equipped with 150mm diameter orifice plate at 0.10 m from bottom of tank. Connects to existing 900mm concrete storm sewer on Tomken Road via 200mm PVC storm service connection. Emergency overflow provided at top of cistern.
Oil-grit separatorOGS Unit
OGS device used for quality control of at-grade runoff prior to cistern. Roof runoff bypasses OGS and discharges directly to cistern.
Best management practices (5)
Underground stormwater cisternOil-grit separator (OGS)Orifice flow controlEmergency overflowErosion and sediment control measures
Site characteristics & report metadata
ProjectWestminster United Church Mississauga Proposed Residential Building Development
Project typeRedevelopment
DeveloperUnited Property Resource Corporation c/o Kindred Works
PermitZBA & OPA
Existing land useresidential and institutional (7-storey apartment building and church with parking)
Proposed land usemulti-unit residential (two 12-storey apartment buildings, 250 units)
Site area1.41 ha
Quality control methodoil-grit separator (OGS) for at-grade runoff; roof runoff bypasses OGS and discharges directly to underground cistern
Extraction audit
Confidence: medium
Completeness: 54%
Source: 44-page PDF
Extractor: PARCELFLOW v1
Validation: review recommended
Source PDF: Functional-Servicing-Report_Oct-2023_OZ-21-17-W3.pdf (44 pages)
Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.