Saint Elizabeth Village · New · 2024-03-20
Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (unknown) | Post-dev (unknown) | Δ |
|---|---|---|---|
| 2-yr | — | — | — |
| 5-yr | — | — | — |
| 10-yr | — | — | — |
| 25-yr | — | — | — |
| 50-yr | — | — | — |
| 100-yr | — | — | — |
CULTEC Isolator rows provide up to 70% long-term TSS removal; system also provides groundwater infiltration as LID measure
Directs stormwater runoff to groundwater infiltration; City initially flagged untreated infiltration concern (10% TSS removal), revised design claims up to 70% TSS removal via isolator rows
Model number and location identified on revised Site Servicing Plan; flows from Areas 1 and 2 routed through OGS
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.