Parsed SWM report

3403-3445 Fieldgate Drive

3403-3445 Fieldgate Drive Mixed-Use Development · Redevelopment · 2024-08-16

Consultant: C.F. Crozier & Associates Inc. Engineer: Julie Scott, P.Eng. P.Eng sealed Model: OTHER Revision: Rev.0
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
pre-vs-post controlled across multiple storms; avg reduction 43%
40%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
2-yr213.6
5-yr287.1
10-yr353.6
25-yr406.1
50-yr453.3
100-yr501.7287−43%
Stormwater controls (3)
Underground storageStormwater Management Tank
Storage volume350.0 m³
Treatment volume214.0 m³
Outletorifice
Outlet invert132.04 m
100-yr HGL134.10 m

Tank area 170.0 m2; 300 mm orifice tube; minimum freeboard 0.30 m; located within P1 underground parking level; controlled release rate 287.0 L/s for 100-year event

Rainwater harvesting / reuseRainwater Retention Tank
Storage volume47.5 m³

Located adjacent to stormwater management tank within P1 underground parking level; required retention volume 72.85 m3 total (25.31 m3 via initial abstraction + 47.54 m3 in tank); water reused for building functions

OtherFiltration Unit

Downstream of stabilization manhole; designed to provide >= 80% TSS removal; specifications to be provided at detailed design stage

Best management practices (6)
Stormwater Management TankOrifice Tube Flow ControlStabilization ManholeFiltration UnitRainwater Retention TankInitial Abstraction
Site characteristics & report metadata
Project3403-3445 Fieldgate Drive Mixed-Use Development
Project typeRedevelopment
DeveloperForest Glen Shopping Centre Ltd.
PermitOPA & ZBA
Existing land usecommercial
Proposed land usemixed-use residential and commercial
Site area1.58 ha
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate353.6 L/s
Quality control methodfiltration unit downstream of stabilization manhole providing >= 80% TSS removal
Extraction audit
Confidence: high Completeness: 83% Source: 151-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: oz-opa-25-1-w3-Functional-Servicing-and-Stormwater-Management-Report-january-2025-january-2025.pdf (151 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.