Parsed SWM report

3033 Dundas Street West

3033 Dundas Street West Mixed-Use Development · Redevelopment · 2025-04-13

Consultant: Arcadis Professional Services (Canada) Inc. Engineer: Angelo Covello Model: UNKNOWN
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
discharge reduction — not documented
0%
Water Quality
TSS removal — not documented
0%
Runoff Volume
water-balance capture (2%/mm) — not documented
0%
Operations
combinable O&A sub-credits — not documented
0%
Net credit
Capped at 50% of annual stormwater charge
0%
Pre vs post peak discharge

No quantified pre-vs-post hydraulic events extracted.

Stormwater controls (1)
Underground storageBrentwood SWM Tank
Storage volume333.3 m³
Treatment volume285.7 m³
Outletorifice
Outlet invert160.09 m

Brentwood SWM Tank with impermeable liner at bottom. Tank dimension = 24 units (L) x 38 units (W) x 1 unit high (D), 21.84m (L) x 17.29m (W) x 0.91m (D). Tank invert = 159.96m, Tank obvert = 160.87m. Active storage volume provided = 285.7m³. Total SWM Tank system active storage = 333.3m³. Outlet via 225mm PVC STM orifice tube at 0.00%.

Best management practices (4)
Underground storage tankStormwater detention systemTrench drainBackwater valves
Site characteristics & report metadata
Project3033 Dundas Street West Mixed-Use Development
Project typeRedevelopment
DeveloperDr. Iram Zando c/o 2504228 Ontario Inc.
Existing land usevacant
Proposed land usemixed-use residential and commercial
Site area0.95 ha
Extraction audit
Confidence: medium Completeness: 50% Source: 57-page PDF Extractor: PARCELFLOW v1 Validation: review recommended
Source PDF: Functional-Servicing-Report-OZ-OPA-25-11-W8-June-2025.pdf (57 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.