Credit scorecard — Mississauga bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
—Peak Flow
discharge reduction — not documented
0%
—Water Quality
TSS removal — not documented
0%
—Runoff Volume
water-balance capture (2%/mm) — not documented
0%
✓Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
10%
Pre vs post peak discharge
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
| 10-yr | 1.137 | 1.14 | +0% |
Stormwater controls (1)
SwaleSide and Back Yard Swales
Roof downspouts discharge onto surface via splash pad and directed towards proposed side and back yard swales; a rear yard catchbasin and 250mm diameter storm sewer connects drainage to the existing 900mm diameter storm sewer on Floradale Drive.
Best management practices (4)
side yard swalesback yard swalesroof downspout splash padssump pumps for basement weeping tiles
Site characteristics & report metadata
ProjectProposed Townhouse Development, 2463-2469 Mimosa Row
Project typeRedevelopment
DeveloperFoxmar Ltd.
Existing land usesingle-family residential
Proposed land usetownhouse residential
Site area0.14 ha
Extraction audit
Confidence: medium
Completeness: 71%
Source: 21-page PDF
Extractor: PARCELFLOW v1
Validation: review recommended
Source PDF: functional-servicing-report-oz-opa-24-14-w7.pdf (21 pages)
Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.