Proposed Mixed Use Development, 2163 & 2169 Sixth Line · Redevelopment · 2022-06-01
Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (L/s) | Post-dev (L/s) | Δ |
|---|---|---|---|
| 5-yr | 163 | 101.7 | −38% |
| 100-yr | 286.6 | 162.3 | −43% |
171mm diameter orifice plate; located in P1 level of underground parking garage; controls 100-year post-development flow to 162.4 L/s (less than 5-year pre-development rate of 163.0 L/s); HWL at 5yr = 144.79m, HWL at 100yr = 145.70m
Provides 88% TSS removal; upstream orifice control flow rate 84.63 L/s; drainage area 0.55 ha; 81.5% imperviousness; fine particle size distribution; manufactured by Imbrium Systems Inc.
Located at east limit of site; Brentwood StormTank modular units (0.760m H x 0.457m W x 0.914m L); 56 units total; 97% void ratio; trench base area 30.0 sq.m; trench height 0.76m; percolation rate 12 mm/hr; drawdown time 72 hours; also serves water balance / LID function; located downstream of OGS
Green roof area 0.070 ha; runoff coefficient 0.40; part of water balance / LID strategy; initial abstraction 5.0mm for green roof area
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.