Proposed Residential Development at 1583 Cormack Crescent · Redevelopment · 2021-02-01

Consultant: Schaeffers Consulting Engineers Engineer: K. Shahbikian Model: PCSWMM Revision: Rev 1
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
pre-vs-post controlled across multiple storms; avg reduction 71%
40%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
combinable O&A sub-credits — not documented
0%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
2-yr57.08
5-yr76.73
10-yr94.5
25-yr119.39
50-yr145.39
100-yr167.5948.5−71%
Stormwater controls (4)
Underground storageCupolex Stormwater Tank
Storage volume225.0 m³
Outletorifice
Outlet invert102.96 m
100-yr HGL103.61 m

150mm diameter orifice tube at elevation 102.96m; HWL 103.61m; discharge rate 0.0485 m3/s; required storage 205 m3; provided storage 225 m3; located at cul-de-sac

Oil-grit separatorStormceptor STC-2000

Provides 50% TSS removal; combined with CB shields to achieve >80% TSS removal; sized using PCSWMM for Stormceptor

Rainwater harvesting / reuseRain Barrels
Storage volume16.0 m³

Four rain barrels of 55 gallons (0.21 m3) per lot at each of 19 lots; achieves approximately 3.257mm retention; supplemented by topsoil amendment

OtherCB Shields (Catch Basin Shields)
Outletother

Provides 50% TSS removal per ETV certification; initial quality control for ROW runoff

Best management practices (6)
Underground storage (Cupolex stormwater tank)Oil Grit Separator (Stormceptor STC-2000)Catch Basin ShieldsRain BarrelsTopsoil AmendmentFlow Restrictor (orifice tube)
Site characteristics & report metadata
ProjectProposed Residential Development at 1583 Cormack Crescent
Project typeRedevelopment
DeveloperELM Cormack (2017) Inc.
Existing land useprivate school
Proposed land usesingle-family residential
Site area0.86 ha
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate57.0 L/s
Quality control methodTreatment train: catch basin shields (50% TSS) + Oil Grit Separator Stormceptor STC-2000 (50% TSS); combined efficiency >80% TSS removal
Extraction audit
Confidence: high Completeness: 92% Source: 90-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: W1_1583_Functional_Servicing_Report_and_Stormwater_Management_Apr2021.pdf (90 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.