Parsed SWM report

1295 Sixth Line

1295 Sixth Line, Oakville · Redevelopment · 2025-04-24

Consultant: EXP Services Inc. Engineer: Scott Passmore, P.Eng. Model: UNKNOWN Revision: Revision 2
Credit scorecard — Oakville 2026 bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums
50%
Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
5-yr41.318.2−56%
25-yr58.735.2−40%
100-yr72.635.4−51%
Stormwater controls (6)
Underground storageGreenstorm Geocellular/Bottomless SWM Chamber
Storage volume80.0 m³
Treatment volume90.0 m³
Outletorifice
Outlet invert125.91 m
100-yr HGL128.24 m

95 mm diameter orifice; actual release rate 37.9 L/s (preliminary design uses 35.4 L/s); bottomless/perforated to allow infiltration; positioned above highest observed groundwater; max drawdown 72 hours; product by Stormcon

InfiltrationGreenstorm Bottomless Chamber Infiltration
Storage volume90.0 m³
Outletoverflow

Infiltration of 25 mm storm event per Town of Oakville 2024 water balance standard; 87.4 m3 required, 90 m3 provided; treated prior to infiltration via OGS upstream

Oil-grit separatorOil Grit Separator (OGS)

Positioned upstream of underground SWM chamber; ETV certified; sized for required particle size distribution by manufacturer; achieves 80% TSS removal

SwaleLID Swales with Enhanced Planting

Low Impact Development swales with enhanced planting as part of grading design

OtherAbove Ground Storage at Low Points
Storage volume4.0 m³

Above ground storage at various low points within paved areas

OtherOversized Storm Sewer Storage
Storage volume6.0 m³
Outletpipe

Storage within site storm sewer system using oversized sewers

Best management practices (9)
Oil Grit Separator (OGS)Underground geocellular/bottomless SWM chamber (Greenstorm by Stormcon)LID swales with enhanced plantingRoof leaders directed to softscape/landscaping for natural infiltrationOversized storm sewers for storageAbove ground storage at low pointsCatchbasin silt sacks (construction ESC)Silt fencing (construction ESC)Mud mat (construction ESC)
Site characteristics & report metadata
Project1295 Sixth Line, Oakville
Project typeRedevelopment
DeveloperCreditmills Development Group
Existing land useresidential (single unit with driveway)
Proposed land useresidential townhouse (30 units, 3 blocks)
Site area0.38 ha
Impervious13% (pre) → 80% (post)
Water balance capture25.0 mm
TSS removal target80%
Allowable release rate41.3 L/s
Quality control methodoil-grit separator upstream of underground geocellular/bottomless infiltration chamber; roof leaders directed to softscape/landscaping for natural infiltration; LID swales with enhanced planting
Extraction audit
Confidence: high Completeness: 100% Source: 36-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.