Parsed SWM report

109 Garden Drive

Proposed Mixed-Use Development at 109 Garden Drive · Redevelopment · 2025-02-04

Consultant: Skira & Associates Ltd. Engineer: Michael Jozwik, P.Eng. P.Eng sealed Model: OTHER Revision: Revised: February 4, 2025
Credit scorecard — Oakville 2026 bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums
50%
Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
50%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
5-yr0.0630.063+0%
100-yr0.0630.063+0%
Stormwater controls (4)
Underground storageCULTEC Recharger 360HD System
Storage volume51.5 m³
Outletorifice

4 rows x 28 units in two sections between Blocks 1 & 2 and 2 & 3 courtyards. Combined with underground storm sewer storage total volume is 80.42 m³. Required detention volume is 78.10 m³.

InfiltrationCultec Infiltration Gallery
Storage volume18.0 m³
Outletother

150 m² base area, 0.30 m depth below outlet, 40% porosity. Drawdown time calculated at 45.0 hrs. Hydraulic conductivity approx. 4.6E-04 for silty sand.

InfiltrationEcoLock Permeable Paving
Storage volume19.8 m³
Outletother

165 m² area, 0.30 m depth, 40% porosity. Bottom elevation 86.30, GWL 84.22. Drawdown time 45.0 hrs. Located in visitor parking area.

Oil-grit separatorHydroDome HD 6 (Hydroworks)
Outletpipe

Provides Level 1 TSS protection (83% annual TSS removal). Treats 100% of annual runoff. Peak flow 0.096 m³/s is less than full pipe flow of 0.29 m³/s. Headloss 273 mm above crown of 450 mm outlet pipe. Drainage area 0.4989 ha, imperviousness 72%, Toronto Central rainfall records.

Best management practices (6)
CULTEC Recharger 360HD underground storage systemHydroDome HD 6 oil/grit separatorCatchbasin shieldsEcoLock permeable pavingRoof downspout disconnection to landscape areasOrifice restrictor plate
Site characteristics & report metadata
ProjectProposed Mixed-Use Development at 109 Garden Drive
Project typeRedevelopment
DeveloperOakville Garden Residences Corp.
Existing land usevacant (formerly residential dwellings, demolished)
Proposed land usemixed-use (retail/commercial and townhouse residential)
Site area0.50 ha
Impervious40% (pre) → 72% (post)
Water balance capture25.0 mm
TSS removal target83%
Allowable release rate63.0 L/s
Quality control methodoil/grit separator (HydroDome HD 6) with catchbasin shields and permeable paving
Extraction audit
Confidence: high Completeness: 100% Source: 43-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.