Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
|---|---|---|---|
| 5-yr | 0.063 | 0.063 | +0% |
| 100-yr | 0.063 | 0.063 | +0% |
4 rows x 28 units in two sections between Blocks 1 & 2 and 2 & 3 courtyards. Combined with underground storm sewer storage total volume is 80.42 m³. Required detention volume is 78.10 m³.
150 m² base area, 0.30 m depth below outlet, 40% porosity. Drawdown time calculated at 45.0 hrs. Hydraulic conductivity approx. 4.6E-04 for silty sand.
165 m² area, 0.30 m depth, 40% porosity. Bottom elevation 86.30, GWL 84.22. Drawdown time 45.0 hrs. Located in visitor parking area.
Provides Level 1 TSS protection (83% annual TSS removal). Treats 100% of annual runoff. Peak flow 0.096 m³/s is less than full pipe flow of 0.29 m³/s. Headloss 273 mm above crown of 450 mm outlet pipe. Drainage area 0.4989 ha, imperviousness 72%, Toronto Central rainfall records.
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.